![Pulsion MBR](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-14-960x768.jpg)
![](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-9-960x768.jpg)
![MBR Installation](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-10-960x768.jpg)
![STP MBR STP](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-13-960x768.jpg)
![MBR](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-15-960x768.jpg)
![MBR](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-12-960x768.jpg)
![PURON MBR](https://akvotek.com.au/wp-content/uploads/2023/04/Untitled-design-11-960x768.jpg)
Compact & Efficient Solution To Bypass Gridlocks
In many regional towns there is a restriction on housing development due to gridlock in the sewage system. This can require a large investment to increase the capacity of the sewage systems and treatment plants. Akvotek’s AkvoMBR is a low cost, turnkey solution to this problem.
Installing Membrane Bioreactor (MBR) treatment plants in a sewer mining operation, wastewater is drawn from an existing sewer, treated to a high regulatory quality standard and, either discharged to the environment or used for potable-replacement applications such as irrigation of public areas, toilet flushing or supply to industry
AkvoMBR is targeted at regional towns where a sewage treatment gridlock exists, sewers are at capacity and property developers are wanting to undertake residential developments